Assessment Year | 2017 |
---|---|
Principal Product | Grey & Ductile Iron Casting |
NAICS | 333911: Pump and Pumping Equipment Manufacturing |
SIC | 3321: Gray and Ductile Iron Foundries |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
182,000
ft2
|
Annual Production | 4,500
ton
|
Production Hrs. Annual | 3,000
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $504,870 | 7,569,722 |
kWh
|
$0.067 | |
Electricity Demand | $237,904 | 27,243 |
kW-mo/yr
|
$8.73 | |
Electricity Fees | $35,711 | - |
|
- | |
Natural Gas | $93,670 | 18,063 |
MMBtu
|
$5.19 | |
Waste Disposal Costs | |||||
Water Usage | $14,572 | 200,000 |
Tgal
|
$0.073 | |
TOTAL YEARLY COSTS | $886,727 | ||||
RECOMMENDED SAVINGS* | $77,985 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $2,287 | $1,245 |
$1,615
24,065
kWh
|
$672
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $823 | $800 |
$745
11,104
kWh
|
- | - | $78 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,337 | $24,875 |
$15,128
225,452
kWh
|
$4,209
-
kW-mo/yr
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,488 | $302 |
$1,200
17,879
kWh
|
$288
-
kW-mo/yr
|
- | - | |
05 | 2.7221: Lower temperature during the winter season and vice-versa | $7,422 | - | - | - |
$7,422
-
MMBtu
|
- | |
06 | 2.6211: Conserve energy by efficient use of vending machines | $459 | $690 |
$389
5,803
kWh
|
$70
-
kW-mo/yr
|
- | - | |
07 | 2.4314: Use synthetic lubricant | $26,785 | $47,960 |
$20,689
308,337
kWh
|
$6,096
-
kW-mo/yr
|
- | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $8,484 | $3,000 |
$6,298
93,862
kWh
|
$2,186
-
kW-mo/yr
|
- | - | |
09 | 2.6218: Turn off equipment when not in use | $131 | - | - | - |
$131
-
MMBtu
|
- | |
10 | 2.2211: Use optimum temperature | $9,226 | - |
$9,226
137,500
kWh
|
- | - | - | |
11 | 2.2511: Insulate bare equipment | $1,543 | $504 | - | - |
$1,543
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $77,985 | $79,376 |
$55,291
824,002
kWh
|
$13,521
-
kW-mo/yr
|
$9,096
-
MMBtu
|
$78 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs