Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,721

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other general purpose machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS2520 #07 Y:2025 Replace existing equipment with more suitable substitutes $81,909 $1,200,000
LS2520 #06 Y:2025 Use solar heat to make electricty $45,568 $526,500
LS2520 #05 Y:2025 Replace fossil fuel equipment with electrical equipment $87,705 $481,830
LS2520 #04 Y:2025 Clean or color roof to reduce solar load $6,832 $34,161
LS2520 #03 Y:2025 Upgrade controls on compressors $5,065 $12,500
LS2520 #02 Y:2025 Install sub-metering equipment $3,354 $3,000
LS2520 #01 Y:2025 Install timers and/or thermostats $13,009 $225
SU0584 #11 Y:2025 Use / purchase optimum sized compressor $9,517 $161,955
SU0584 #10 Y:2025 Use solar heat to make electricty $126,642 $1,485,078
SU0584 #09 Y:2025 Install vinyl strip / high speed / air curtain doors $2,030 $8,127
SU0584 #08 Y:2025 Install occupancy sensors $249 $568
SU0584 #07 Y:2025 Conserve energy by efficient use of vending machines $435 $745
SU0584 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,133 $68
SU0584 #05 Y:2025 Install compressor air intakes in coolest locations $4,694 $695
SU0584 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,984 $367
SU0584 #03 Y:2025 Use or replace with energy efficient substitutes $2,313 $73
SU0584 #02 Y:2025 Disconnect ballasts $2,976 -
SU0584 #01 Y:2025 Eliminate or reduce compressed air usage $4,436 -
MU0078 #10 Y:2025 Install partitions to reduce size of conditioned space $131 -
MU0078 #09 Y:2025 Use proper thickness of insulation on building envelope $2,407 $6,214