ITAC Assessment: NT0067
ITAC logo
ITAC Assessment: NT0067
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Fracking Pumps
NAICS 333912: Air and Gas Compressor Manufacturing
SIC 3561: Pumps and Pumping Equipment
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 90,000
ft2
Annual Production 720
units
Production Hrs. Annual 3,298
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,971 2,560,334
kWh
Electricity Demand $277,886 29,275
kW-mo/yr
Electricity Fees $14,130 -
Natural Gas $30,501 2,549
MMBtu
Waste Disposal Costs
Water Usage $7,115 12,876
Tgal
TOTAL YEARLY COSTS $436,603
RECOMMENDED SAVINGS* $353,383 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4321: Upgrade obsolete equipment $214,633 $1,203,000 $855
20,470
kWh
$778
-
kW-mo/yr
- - $63,000 $150,000
02 2.7232: Replace existing hvac unit with high efficiency model $83,537 $362,950 $3,152
75,431
kWh
- - - - $80,385
03 2.8121: Apply for tax-free status for energy purchases $32,870 $5,000 - - $32,870 - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $10,162 $35,316 $5,529
132,340
kWh
$4,633
-
kW-mo/yr
- - - -
05 2.6218: Turn off equipment when not in use $8,377 $625 - - - $8,377
-
MMBtu
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,483 $5,753 $1,359
32,538
kWh
$1,124
-
kW-mo/yr
- - - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,320 - $723
17,302
kWh
$597
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $353,383 $1,612,644 $11,618
278,081
kWh
$7,132
-
kW-mo/yr
$32,870 $8,377
-
MMBtu
$63,000 $230,385
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs