| Assessment Year | 2023 |
|---|---|
| Principal Product | Plastic Caps |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 57 |
| Plant Area |
220,000
ft2
|
| Annual Production | 3,400,000,000
pieces
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $1,492,017 | 28,070,809 |
kWh
|
$0.053 | |
| Natural Gas | $3,709 | 309 |
MMBtu
|
$12.01 | |
| Waste Disposal Costs | |||||
| Water Usage | $4,065 | 560 |
Tgal
|
$7.26 | |
| Water Disposal | $4,558 | 560 |
Tgal
|
$8.14 | |
| TOTAL YEARLY COSTS | $1,504,349 | ||||
| RECOMMENDED SAVINGS* | $77,423 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4235: Remove or close off unneeded compressed air lines | $14,419 | $320 |
$14,419
271,035
kWh
|
- | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,203 | $60 |
$3,203
60,209
kWh
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,814 | $28,960 |
$10,814
203,280
kWh
|
- | |
| 04 | 2.6127: Maintain air filters by cleaning or replacement | $2,238 | $1,864 |
$2,238
42,069
kWh
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $224 | $765 |
$224
4,207
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,448 | $8,951 |
$1,226
23,050
kWh
|
$2,222 | |
| 07 | 2.9114: Use solar heat to make electricty | $43,077 | $421,486 |
$43,077
667,626
kWh
|
- | |
| TOTAL RECOMMENDED | $77,423 | $462,406 |
$75,201
1,271,476
kWh
|
$2,222 | ||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs