Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Engine, turbine, and power transmission equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IA0493 #06 Y:2012 Direct warmest air to combustion intake $328 $200
IA0493 #05 Y:2012 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $7,659 $3,000
IA0493 #04 Y:2012 Reduce the pressure of compressed air to the minimum required $4,291 $105
IA0493 #03 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $11,452 $2,000
IA0493 #02 Y:2012 Install occupancy sensors $2,326 $2,120
IA0493 #01 Y:2012 Utilize higher efficiency lamps and/or ballasts $112,998 $128,338
IA0368 #06 Y:2005 Reduce the pressure of compressed air to the minimum required $5,100 $6,924
IA0368 #05 Y:2005 Install occupancy sensors $1,048 $1,694
IA0368 #04 Y:2005 Utilize higher efficiency lamps and/or ballasts $7,898 $31,761
IA0368 #03 Y:2005 Utilize higher efficiency lamps and/or ballasts $1,778 $3,095
IA0368 #02 Y:2005 Reduce the pressure of compressed air to the minimum required $23,794 $53,000
IA0368 #01 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $1,120 $1,065