ITAC Assessment: IA0368
ITAC logo
ITAC Assessment: IA0368
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Half Shell Bearings and Solid Flanged Bearings
NAICS 333613: Mechanical Power Transmission Equipment Manufacturing
SIC 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 176,000
ft2
Annual Production 15,000,000
lb
Production Hrs. Annual 4,500
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $355,114 13,636,430
kWh
Electricity Demand $96,117 34,620
kW-mo/yr
Electricity Fees $1,188 -
Natural Gas $138,235 17,840
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,738 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,120

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,120 $1,065 $878
33,885
kWh
$242
-
kW-mo/yr
02 2.4231: Reduce the pressure of compressed air to the minimum required $23,794 $53,000 $18,648
720,000
kWh
$5,146
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,778 $3,095 $1,474
56,899
kWh
$304
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,898 $31,761 $6,185
238,792
kWh
$1,713
-
kW-mo/yr
05 2.7135: Install occupancy sensors $1,048 $1,694 $1,048
40,481
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $5,100 $6,924 $3,997
154,350
kWh
$1,103
-
kW-mo/yr
TOTAL RECOMMENDED $40,738 $97,539 $32,230
1,244,407
kWh
$8,508
-
kW-mo/yr
TOTAL IMPLEMENTED $1,120 $1,065 $878
33,885
kWh
$242
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs