ITAC Assessment: IA0493
ITAC logo
ITAC Assessment: IA0493
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Hydraulic pumps and motors
NAICS 333611: Turbine and Turbine Generator Set Units Manufacturing
SIC 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units
Sales Range $100
M
to 500
M
# of Employees 491
Plant Area 359,060
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,695,113 24,854,540
kWh
Electricity Demand $148,946 50,677
kW-mo/yr
Natural Gas $130,769 30,334
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $139,054 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $128,741

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $112,998 $128,338 $106,545
1,564,536
kWh
$6,453
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $2,326 $2,120 $2,326
34,157
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,452 $2,000 $10,798
158,556
kWh
$654
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,291 $105 $4,045
59,405
kWh
$246
-
kW-mo/yr
-
05 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $7,659 $3,000 $7,269
106,733
kWh
$390
-
kW-mo/yr
-
06 2.1213: Direct warmest air to combustion intake $328 $200 - - $328
-
MMBtu
TOTAL RECOMMENDED $139,054 $135,763 $130,983
1,923,387
kWh
$7,743
-
kW-mo/yr
$328
-
MMBtu
TOTAL IMPLEMENTED $128,741 $130,443 $121,388
1,782,497
kWh
$7,353
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs