Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

469

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Engine, turbine, and power transmission equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0485 #11 Y:2019 Conserve energy by efficient use of vending machines $347 $1,404
SU0485 #10 Y:2019 Utilize higher efficiency lamps and/or ballasts $15,242 $26,026
SU0485 #09 Y:2019 Use photocell controls $1,305 $1,645
SU0485 #08 Y:2019 Utilize higher efficiency lamps and/or ballasts $387 $415
SU0485 #07 Y:2019 Install compressor air intakes in coolest locations $2,923 $2,832
SU0485 #06 Y:2019 Reduce ventilation air $1,310 $944
SU0485 #05 Y:2019 Eliminate/reduce an operation $10,786 $6,500
SU0485 #04 Y:2019 Apply for tax-free status for energy purchases $707 $264
SU0485 #03 Y:2019 Use or replace with energy efficient substitutes $344 $75
SU0485 #02 Y:2019 Apply for tax-free status for energy purchases $3,064 $264
SU0485 #01 Y:2019 Reduce the pressure of compressed air to the minimum required $1,025 -
OK0965 #10 Y:2017 Reduce space conditioning during non-working hours $3,351 -
OK0965 #09 Y:2017 Reduce the pressure of compressed air to the minimum required $159 -
OK0965 #08 Y:2017 Recover waste heat from equipment $353 $919
OK0965 #07 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $500 $325
OK0965 #06 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $858 $4,081
OK0965 #05 Y:2017 Utilize higher efficiency lamps and/or ballasts $918 $3,250
OK0965 #04 Y:2017 Use photocell controls $765 $3,975
OK0965 #03 Y:2017 Utilize higher efficiency lamps and/or ballasts $1,316 $6,286
OK0965 #02 Y:2017 Utilize higher efficiency lamps and/or ballasts $6,915 $25,287