Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

282

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Machine tool manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MU0050 #09 Y:2024 Install partitions to reduce size of conditioned space $540 $2,466
MU0050 #08 Y:2024 Close holes and openings in building such as broken windows $6,301 $10,644
MU0050 #07 Y:2024 Reduce space conditioning during non-working hours $1,230 -
MU0050 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,560 $2,073
MU0050 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $98 $320
MU0050 #04 Y:2024 Turn off equipment when not in use $20 $47
MU0050 #03 Y:2024 Use or replace with energy efficient substitutes $732 $435
MU0050 #02 Y:2024 Use or replace with energy efficient substitutes $45,726 $23,976
MU0050 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,159 $262
WM0213 #06 Y:2023 Install compressor air intakes in coolest locations $463 $1,730
WM0213 #05 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,049 $125
WM0213 #04 Y:2023 Recharge batteries on during off-peak demand periods $2,240 $2,590
WM0213 #03 Y:2023 Install occupancy sensors $2,965 $267
WM0213 #02 Y:2023 Use radiant heater for spot heating $3,521 $16,500
WM0213 #01 Y:2023 Insulate glazing, walls, ceilings, and roofs $10,341 $20,389
MZ0307 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $809 $1,130
MZ0307 #02 Y:2021 Utilize higher efficiency lamps and/or ballasts $3,100 $6,233
MZ0307 #01 Y:2021 Reschedule plant operations or reduce load to avoid peaks $6,351 $1,250
NC0644 #06 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $12,387 $50,000
NC0644 #05 Y:2019 Reschedule plant operations or reduce load to avoid peaks $5,800 -