Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

128

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Cutting tool and machine tool accessory manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MU0057 #14 Y:2024 Pay bills on time to avoid late fees $269 -
MU0057 #13 Y:2024 Use solar heat to make electricty $24,103 $157,869
MU0057 #12 Y:2024 Use proper thickness of insulation on building envelope $4,569 $10,184
MU0057 #11 Y:2024 Install vinyl strip / high speed / air curtain doors $1,583 $4,257
MU0057 #10 Y:2024 Install timers and/or thermostats $528 $1,180
MU0057 #09 Y:2024 Lower temperature during the winter season and vice-versa $223 -
MU0057 #08 Y:2024 Utilize higher efficiency lamps and/or ballasts $4,761 -
MU0057 #07 Y:2024 Install occupancy sensors $819 $824
MU0057 #06 Y:2024 Use photocell controls $381 $1,824
MU0057 #05 Y:2024 Turn off equipment when not in use $1,118 -
MU0057 #04 Y:2024 Use or replace with energy efficient substitutes $5,897 $4,100
MU0057 #03 Y:2024 Use or replace with energy efficient substitutes $12,535 $24,704
MU0057 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $596 -
MU0057 #01 Y:2024 Reduce the pressure of compressed air to the minimum required $2,622 -
SD0630 #08 Y:2023 Utilize controls to operate equipment only when needed $5,832 $1,080
SD0630 #07 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $1,113 $3,606
SD0630 #06 Y:2023 Use solar heat to make electricty $15,881 $57,222
SD0630 #05 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $3,049 $13,269
SD0630 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $3,850 $9,294
SD0630 #03 Y:2023 Reduce the pressure of compressed air to the minimum required $598 $500