Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

131

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Special die and tool, die set, jig, and fixture manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0948 #07 Y:2020 Use solar heat to make electricty $59,987 $503,684
GT0948 #06 Y:2020 Utilize energy-efficient belts and other improved mechanisms $722 $1,492
GT0948 #05 Y:2020 Utilize higher efficiency lamps and/or ballasts $18,214 $12,496
GT0948 #04 Y:2020 Install occupancy sensors $8,479 $4,145
GT0948 #03 Y:2020 Air condition only space necessary $6,270 $2,979
GT0948 #02 Y:2020 Apply for tax-free status for energy purchases $4,998 $2,000
GT0948 #01 Y:2020 Utilize controls to operate equipment only when needed $7,480 $2,300
TT0188 #05 Y:2017 Install timers and/or thermostats $684 $450
TT0188 #04 Y:2017 Turn off equipment during breaks, reduce operating time $2,153 $890
TT0188 #03 Y:2017 Utilize higher efficiency lamps and/or ballasts $3,331 $8,433
TT0188 #02 Y:2017 Use power during off-peak periods $10,583 $100
TT0188 #01 Y:2017 Use solar heat for heat $23,768 $97,975
SD0485 #07 Y:2014 Use most efficient type of electric motors $1,832 $4,400
SD0485 #06 Y:2014 Use photocell controls $1,975 $5,550
SD0485 #05 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $5,114 $1,000
SD0485 #04 Y:2014 Clean or color roof to reduce solar load $13,807 $28,125
SD0485 #03 Y:2014 Replace existing hvac unit with high efficiency model $25,053 $91,900
SD0485 #02 Y:2014 Reschedule plant operations or reduce load to avoid peaks $31,720 $5,000
SD0485 #01 Y:2014 Replace electrically-operated equipment with fossil fuel equipment $117,088 $25,225
WM0011 #09 Y:2012 Improve space comfort conditioning $2,993 $3,000