131
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | Special die and tool, die set, jig, and fixture manufacturing | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
GT0948 #07 Y:2020 | 07 | 2020 | Use solar heat to make electricty | $59,987 | $503,684 | |
GT0948 #06 Y:2020 | 06 | 2020 | Utilize energy-efficient belts and other improved mechanisms | $722 | $1,492 | |
GT0948 #05 Y:2020 | 05 | 2020 | Utilize higher efficiency lamps and/or ballasts | $18,214 | $12,496 | |
GT0948 #04 Y:2020 | 04 | 2020 | Install occupancy sensors | $8,479 | $4,145 | |
GT0948 #03 Y:2020 | 03 | 2020 | Air condition only space necessary | $6,270 | $2,979 | |
GT0948 #02 Y:2020 | 02 | 2020 | Apply for tax-free status for energy purchases | $4,998 | $2,000 | |
GT0948 #01 Y:2020 | 01 | 2020 | Utilize controls to operate equipment only when needed | $7,480 | $2,300 | |
TT0188 #05 Y:2017 | 05 | 2017 | Install timers and/or thermostats | $684 | $450 | |
TT0188 #04 Y:2017 | 04 | 2017 | Turn off equipment during breaks, reduce operating time | $2,153 | $890 | |
TT0188 #03 Y:2017 | 03 | 2017 | Utilize higher efficiency lamps and/or ballasts | $3,331 | $8,433 | |
TT0188 #02 Y:2017 | 02 | 2017 | Use power during off-peak periods | $10,583 | $100 | |
TT0188 #01 Y:2017 | 01 | 2017 | Use solar heat for heat | $23,768 | $97,975 | |
SD0485 #07 Y:2014 | 07 | 2014 | Use most efficient type of electric motors | $1,832 | $4,400 | |
SD0485 #06 Y:2014 | 06 | 2014 | Use photocell controls | $1,975 | $5,550 | |
SD0485 #05 Y:2014 | 05 | 2014 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,114 | $1,000 | |
SD0485 #04 Y:2014 | 04 | 2014 | Clean or color roof to reduce solar load | $13,807 | $28,125 | |
SD0485 #03 Y:2014 | 03 | 2014 | Replace existing hvac unit with high efficiency model | $25,053 | $91,900 | |
SD0485 #02 Y:2014 | 02 | 2014 | Reschedule plant operations or reduce load to avoid peaks | $31,720 | $5,000 | |
SD0485 #01 Y:2014 | 01 | 2014 | Replace electrically-operated equipment with fossil fuel equipment | $117,088 | $25,225 | |
WM0011 #09 Y:2012 | 09 | 2012 | Improve space comfort conditioning | $2,993 | $3,000 |