ITAC Assessment: GT0948
ITAC logo
ITAC Assessment: GT0948
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Metal Stamping and Assemblies
NAICS 333514: Special Die and Tool, Die Set, Jig, and Fixture Manufacturing
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $10
M
to 50
M
# of Employees 98
Plant Area 120,000
ft2
Annual Production 26,531,975
units
Production Hrs. Annual 5,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $306,676 2,797,387
kWh
Natural Gas $17,050 2,027
MMBtu
TOTAL YEARLY COSTS $323,726
RECOMMENDED SAVINGS* $106,151 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,164

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.6231: Utilize controls to operate equipment only when needed $7,480 $2,300 $7,480
68,250
kWh
-
02 2.8121: Apply for tax-free status for energy purchases $4,998 $2,000 - $4,998
03 2.7229: Air condition only space necessary $6,270 $2,979 $6,270
57,207
kWh
-
04 2.7135: Install occupancy sensors $8,479 $4,145 $8,479
77,366
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $18,214 $12,496 $18,214
166,189
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $722 $1,492 $722
6,592
kWh
-
07 2.9114: Use solar heat to make electricty $59,987 $503,684 $59,987
550,803
kWh
-
TOTAL RECOMMENDED $106,151 $529,096 $101,153
926,407
kWh
$4,998
TOTAL IMPLEMENTED $46,164 $25,412 $41,166
375,604
kWh
$4,998
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs