1,067
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| DL0103 #02 Y:2013 | 02 | 2013 | Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $25,000 | $45,000 | |
| DL0103 #01 Y:2013 | 01 | 2013 | Reduce ventilation air | $59,100 | $250,000 | |
| SD0463 #07 Y:2012 | 07 | 2012 | Reschedule plant operations or reduce load to avoid peaks | $467 | $200 | |
| SD0463 #06 Y:2012 | 06 | 2012 | Reduce the pressure of compressed air to the minimum required | $564 | $200 | |
| SD0463 #05 Y:2012 | 05 | 2012 | Clean or color roof to reduce solar load | $2,233 | $5,250 | |
| SD0463 #04 Y:2012 | 04 | 2012 | Install timers on light switches in little used areas | $2,768 | $2,210 | |
| SD0463 #03 Y:2012 | 03 | 2012 | Use photocell controls | $2,625 | $1,850 | |
| SD0463 #02 Y:2012 | 02 | 2012 | Use adjustable frequency drive or multiple speed motors on existing system | $4,131 | $6,224 | |
| SD0463 #01 Y:2012 | 01 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,304 | $1,500 | |
| WV0463 #13 Y:2012 | 13 | 2012 | Disconnect ballasts | $59 | $77 | |
| WV0463 #12 Y:2012 | 12 | 2012 | Develop a repair/replace policy | $116 | $164 | |
| WV0463 #11 Y:2012 | 11 | 2012 | Remove or close off unneeded compressed air lines | $534 | $61 | |
| WV0463 #10 Y:2012 | 10 | 2012 | Improve lubrication practices | $560 | $500 | |
| WV0463 #09 Y:2012 | 09 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $933 | $214 | |
| WV0463 #08 Y:2012 | 08 | 2012 | Utilize higher efficiency lamps and/or ballasts | $1,099 | $5,677 | |
| WV0463 #07 Y:2012 | 07 | 2012 | Utilize energy-efficient belts and other improved mechanisms | $1,250 | - | |
| WV0463 #06 Y:2012 | 06 | 2012 | Utilize higher efficiency lamps and/or ballasts | $1,349 | $2,378 | |
| WV0463 #05 Y:2012 | 05 | 2012 | Eliminate or reduce compressed air usage | $1,730 | $818 | |
| WV0463 #04 Y:2012 | 04 | 2012 | Establish a predictive maintenance program | $2,352 | $1,000 | |
| WV0463 #03 Y:2012 | 03 | 2012 | Recover waste heat from equipment | $3,058 | $2,164 |