Assessment Year | 2013 |
---|---|
Principal Product | ceramic fiber |
NAICS | 333414: Heating Equipment (except Warm Air Furnaces) Manufacturing |
SIC | 3433: Heating Equipment, Except Electric and Warm Air Furnaces |
Sales Range | $5 M to 10M |
# of Employees | 39 |
Plant Area |
116,000
ft2
|
Annual Production | 500,000
lb
|
Production Hrs. Annual | 2,760
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $155,646 | 1,637,600 |
kWh
|
$0.095 |
Natural Gas | $75,616 | 11,160 |
MMBtu
|
$6.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,196 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,156 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,159 | $16,082 |
$12,159
127,927
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,997 | $14,290 |
$8,997
94,655
kWh
|
- | - | |
03 | 2.2437: Recover waste heat from equipment | $3,058 | $2,164 | - |
$3,058
-
MMBtu
|
- | |
04 | 2.4157: Establish a predictive maintenance program | $2,352 | $1,000 |
$3,437
36,158
kWh
|
- | $(-1,085.0) | |
05 | 2.4239: Eliminate or reduce compressed air usage | $1,730 | $818 |
$1,730
18,205
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,349 | $2,378 |
$1,349
14,197
kWh
|
- | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,250 | - |
$1,250
13,149
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,099 | $5,677 |
$1,099
11,563
kWh
|
- | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $933 | $214 |
$933
9,821
kWh
|
- | - | |
10 | 2.4312: Improve lubrication practices | $560 | $500 |
$560
5,888
kWh
|
- | - | |
11 | 2.4235: Remove or close off unneeded compressed air lines | $534 | $61 |
$534
5,613
kWh
|
- | - | |
12 | 2.4151: Develop a repair/replace policy | $116 | $164 |
$181
1,903
kWh
|
- | $(-65.0) | |
13 | 2.7122: Disconnect ballasts | $59 | $77 |
$59
618
kWh
|
- | - | |
TOTAL RECOMMENDED | $34,196 | $43,425 |
$32,288
339,697
kWh
|
$3,058
-
MMBtu
|
$(-1,150.0) | ||
TOTAL IMPLEMENTED | $25,156 | $39,218 |
$25,156
264,669
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |