Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

192

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Food product machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MU0025 #10 Y:2023 Recover waste heat from equipment $2,348 $9,576
MU0025 #09 Y:2023 Use proper thickness of insulation on building envelope $13,952 $19,852
MU0025 #08 Y:2023 Reduce illumination to minimum necessary levels $431 -
MU0025 #07 Y:2023 Utilize higher efficiency lamps and/or ballasts $1,434 $2,876
MU0025 #06 Y:2023 Use optimum temperature $1,361 -
MU0025 #05 Y:2023 Use proper thickness of insulation on building envelope $382 $690
MU0025 #04 Y:2023 Keep equipment clean $332 -
MU0025 #03 Y:2023 Install occupancy sensors $37 $50
MU0025 #02 Y:2023 Reduce the pressure of compressed air to the minimum required $2,096 -
MU0025 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $3,630 $360
GT0942 #07 Y:2019 Use solar heat to make electricty $114,607 $699,103
GT0942 #06 Y:2019 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $113,048 $690,000
GT0942 #05 Y:2019 Minimize water usage $3,202 $5,700
GT0942 #04 Y:2019 Utilize higher efficiency lamps and/or ballasts $50,179 $71,763
GT0942 #03 Y:2019 Lower light fixtures in high ceiling areas $14,945 $4,781
GT0942 #02 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $15,618 $2,500
GT0942 #01 Y:2019 Reduce the pressure of compressed air to the minimum required $20,227 $1,450
LS1909 #06 Y:2019 Install vinyl strip / high speed / air curtain doors $651 $635
LS1909 #05 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $447 $300
LS1909 #04 Y:2019 Utilize energy-efficient belts and other improved mechanisms $980 $320