ITAC Assessment: MU0025
ITAC logo
ITAC Assessment: MU0025
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Coffee
NAICS 333241: Food Product Machinery Manufacturing
SIC 2095: Roasted Coffee
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 92,000
ft2
Annual Production 650,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,911 925,840
kWh
Electricity Fees $8,096 -
Natural Gas $130,075 13,944
MMBtu
TOTAL YEARLY COSTS $276,082
RECOMMENDED SAVINGS* $26,003 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,273

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,630 $360 $3,630
24,202
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,096 - $2,096
13,975
kWh
-
03 2.7135: Install occupancy sensors $37 $50 $37
248
kWh
-
04 2.6125: Keep equipment clean $332 - $332
2,210
kWh
-
05 2.7492: Use proper thickness of insulation on building envelope $382 $690 - $382
-
MMBtu
06 2.2211: Use optimum temperature $1,361 - $179
1,196
kWh
$1,181
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,434 $2,876 $1,434
9,562
kWh
-
08 2.7111: Reduce illumination to minimum necessary levels $431 - $431
2,873
kWh
-
09 2.7492: Use proper thickness of insulation on building envelope $13,952 $19,852 - $13,952
-
MMBtu
10 2.2437: Recover waste heat from equipment $2,348 $9,576 - $2,348
-
MMBtu
TOTAL RECOMMENDED $26,003 $33,405 $8,139
54,265
kWh
$17,863
-
MMBtu
TOTAL IMPLEMENTED $23,273 $23,139 $8,139
54,265
kWh
$15,133
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs