Assessment Year | 2023 |
---|---|
Principal Product | Coffee |
NAICS | 333241: Food Product Machinery Manufacturing |
SIC | 2095: Roasted Coffee |
Sales Range | $5 M to 10M |
# of Employees | 75 |
Plant Area |
92,000
ft2
|
Annual Production | 650,000
lb
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $137,911 | 925,840 |
kWh
|
$0.15 |
Electricity Fees | $8,096 | - |
|
- |
Natural Gas | $130,075 | 13,944 |
MMBtu
|
$9.33 |
TOTAL YEARLY COSTS | $276,082 | |||
RECOMMENDED SAVINGS* | $26,003 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,273 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,630 | $360 |
$3,630
24,202
kWh
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,096 | - |
$2,096
13,975
kWh
|
- | |
03 | 2.7135: Install occupancy sensors | $37 | $50 |
$37
248
kWh
|
- | |
04 | 2.6125: Keep equipment clean | $332 | - |
$332
2,210
kWh
|
- | |
05 | 2.7492: Use proper thickness of insulation on building envelope | $382 | $690 | - |
$382
-
MMBtu
|
|
06 | 2.2211: Use optimum temperature | $1,361 | - |
$179
1,196
kWh
|
$1,181
-
MMBtu
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,434 | $2,876 |
$1,434
9,562
kWh
|
- | |
08 | 2.7111: Reduce illumination to minimum necessary levels | $431 | - |
$431
2,873
kWh
|
- | |
09 | 2.7492: Use proper thickness of insulation on building envelope | $13,952 | $19,852 | - |
$13,952
-
MMBtu
|
|
10 | 2.2437: Recover waste heat from equipment | $2,348 | $9,576 | - |
$2,348
-
MMBtu
|
|
TOTAL RECOMMENDED | $26,003 | $33,405 |
$8,139
54,265
kWh
|
$17,863
-
MMBtu
|
||
TOTAL IMPLEMENTED | $23,273 | $23,139 |
$8,139
54,265
kWh
|
$15,133
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs