Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

177

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Mining machinery and equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0670 #11 Y:2024 Analyze flue gas for proper air/fuel ratio $237 $1,029
WV0670 #10 Y:2024 Reduce the pressure of compressed air to the minimum required $666 $148
WV0670 #09 Y:2024 Insulate bare equipment $878 $581
WV0670 #08 Y:2024 Develop a repair/replace policy $1,123 $1,296
WV0670 #07 Y:2024 Eliminate or reduce compressed air usage $1,211 $1,154
WV0670 #06 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $1,691 $8,244
WV0670 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,506 $770
WV0670 #04 Y:2024 Upgrade controls on compressors $8,001 $13,171
WV0670 #03 Y:2024 Use or replace with energy efficient substitutes $10,770 $43,200
WV0670 #02 Y:2024 Install outside air damper / economizer on hvac unit $15,802 $77,610
WV0670 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $39,114 $61,425
UU0227 #12 Y:2023 Use or replace with energy efficient substitutes $53 $333
UU0227 #11 Y:2023 Check for accuracy of utility / power meters $2,160 $2,000
UU0227 #10 Y:2023 Minimize water usage $2,457 $2,652
UU0227 #09 Y:2023 Reduce the pressure of compressed air to the minimum required $4,237 $6,000
UU0227 #08 Y:2023 Install occupancy sensors $4,289 $9,282
UU0227 #07 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $4,564 $7,061
UU0227 #06 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $4,776 $3,465
UU0227 #05 Y:2023 Utilize higher efficiency lamps and/or ballasts $5,358 $13,337
UU0227 #04 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $11,103 $7,349