Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,286

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Agriculture, construction, and mining machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LT8446 #05 Y:2026 Purchase new equipment to reduce material use / cost $1,159 $33,752
LT8446 #04 Y:2026 Install occupancy sensors $186 $568
LT8446 #03 Y:2026 Turn off equipment when not in use $304 $871
LT8446 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $139 $308
LT8446 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $494 $1,223
LS2605 #06 Y:2026 Replace fossil fuel equipment with electrical equipment $78,865 $433,647
LS2605 #05 Y:2026 Upgrade controls on compressors $2,498 $12,500
LS2605 #04 Y:2026 Install sub-metering equipment $6,258 $5,250
LS2605 #03 Y:2026 Clean and maintain refrigerant condensers and towers $1,247 $490
LS2605 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $365 $45
LS2605 #01 Y:2026 Reduce the pressure of compressed air to the minimum required $1,280 $25
UU0288 #05 Y:2025 Eliminate or reduce compressed air usage $2,025 $6,732
UU0288 #04 Y:2025 Recover waste heat from equipment $832 $5,310
UU0288 #03 Y:2025 Recover waste heat from equipment $15,325 $47,180
UU0288 #02 Y:2025 Reschedule plant operations or reduce load to avoid peaks $9,190 $15,750
UU0288 #01 Y:2025 Install an uninteruptable power supply $150,000 $1,225,000
MS0454 #04 Y:2025 Re-size charging openings or add movable cover or door $12,383 -
MS0454 #03 Y:2025 Replace treated water with well / surface water $18,747 $35,952
MS0454 #02 Y:2025 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $11,257 $1,712
MS0454 #01 Y:2025 Purchase equipment instead of leasing $85,200 $140,028