ITAC Assessment: OK1143
ITAC logo
ITAC Assessment: OK1143
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Tilling & harvesting equipment
NAICS 333111: Farm Machinery and Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 110,000
ft2
Annual Production 875,000
lb
Production Hrs. Annual 2,600
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,101 387,648
kWh
Electricity Demand $4,689 647
kW-mo/yr
Natural Gas $16,823 3,055
MMBtu
Waste Disposal Costs
Water Usage $2,577 284
Tgal
TOTAL YEARLY COSTS $58,190
RECOMMENDED SAVINGS* $10,088 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $693 $3,315 $502
5,702
kWh
$191
-
kW-mo/yr
- -
02 2.9114: Use solar heat to make electricty $3,424 $25,650 $3,424
38,910
kWh
- - -
03 2.7261: Install timers and/or thermostats $1,973 $1,950 - - $1,973
-
MMBtu
-
04 2.7232: Replace existing hvac unit with high efficiency model $609 $4,675 $609
6,923
kWh
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,910 $4,426 $1,910
21,699
kWh
- - -
06 2.3212: Optimize plant power factor $1,479 $2,457 - - - $1,479
TOTAL RECOMMENDED $10,088 $42,473 $6,445
73,234
kWh
$191
-
kW-mo/yr
$1,973
-
MMBtu
$1,479
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs