| Assessment Year | 2025 |
|---|---|
| Principal Product | Tilling & harvesting equipment |
| NAICS | 333111: Farm Machinery and Equipment Manufacturing |
| SIC | 3523: Farm Machinery and Equipment |
| Sales Range | $5 M to 10M |
| # of Employees | 40 |
| Plant Area |
110,000
ft2
|
| Annual Production | 875,000
lb
|
| Production Hrs. Annual | 2,600
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $34,101 | 387,648 |
kWh
|
$0.088 | |
| Electricity Demand | $4,689 | 647 |
kW-mo/yr
|
$7.25 | |
| Natural Gas | $16,823 | 3,055 |
MMBtu
|
$5.51 | |
| Waste Disposal Costs | |||||
| Water Usage | $2,577 | 284 |
Tgal
|
$9.07 | |
| TOTAL YEARLY COSTS | $58,190 | ||||
| RECOMMENDED SAVINGS* | $10,088 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $693 | $3,315 |
$502
5,702
kWh
|
$191
-
kW-mo/yr
|
- | - | |
| 02 | 2.9114: Use solar heat to make electricty | $3,424 | $25,650 |
$3,424
38,910
kWh
|
- | - | - | |
| 03 | 2.7261: Install timers and/or thermostats | $1,973 | $1,950 | - | - |
$1,973
-
MMBtu
|
- | |
| 04 | 2.7232: Replace existing hvac unit with high efficiency model | $609 | $4,675 |
$609
6,923
kWh
|
- | - | - | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,910 | $4,426 |
$1,910
21,699
kWh
|
- | - | - | |
| 06 | 2.3212: Optimize plant power factor | $1,479 | $2,457 | - | - | - | $1,479 | |
| TOTAL RECOMMENDED | $10,088 | $42,473 |
$6,445
73,234
kWh
|
$191
-
kW-mo/yr
|
$1,973
-
MMBtu
|
$1,479 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs