ITAC Assessment: SD0047
ITAC logo
ITAC Assessment: SD0047
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product PRECISION METAL PRODUCTS
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 8
pieces
Production Hrs. Annual 4,160
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,230 958,089
kWh
Natural Gas $4,920 746
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,787 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,914

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $283 $560 $283
2,638
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,916 $220 $2,916
25,498
kWh
-
03 2.4239: Eliminate or reduce compressed air usage $2,603 - $2,603
22,860
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $233 $20 $233
2,052
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,229 - $1,424
13,189
kWh
$(-195.0)
06 2.7144: Install spectral reflectors / delamp $4,270 $5,700 $3,819
33,411
kWh
$451
07 2.6232: Install set-back timers $2,253 $3,440 $2,026
17,878
kWh
$227
TOTAL RECOMMENDED $13,787 $9,940 $13,304
117,526
kWh
$483
TOTAL IMPLEMENTED $6,914 $4,240 $6,882
61,255
kWh
$32
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs