ITAC Assessment: WI0347
ITAC logo
ITAC Assessment: WI0347
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Metal Stampings
NAICS
n/a
SIC 3462: Iron and Steel Forgings
Sales Range $50
M
to 100
M
# of Employees 173
Plant Area 104,570
ft2
Annual Production 6,000,000
pieces
Production Hrs. Annual 6,500
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,576 2,088,804
kWh
Electricity Demand $61,257 4,942
kW-mo/yr
Electricity Fees $13,504 -
Natural Gas $12,218 2,917
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $183,847 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,061

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 4.126: Install sensors to detect defects $168,000 $35,000 - - - - $168,000 -
02 3.6193: Install equipment (eg compactor) to reduce disposal costs $7,386 - - - - $7,386
-
lb
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,327 $3,116 $1,721
44,842
kWh
$1,606
-
kW-mo/yr
- - - -
04 3.5315: Lease / purchase baler; sell cardboard to recycler $2,549 $9,000 $(-6.0)
(-293)
kWh
- - $3,255
-
lb
$(-700.0) -
05 3.7137: Replace cloth rags with paper towels $1,037 - - - - - - $1,037
06 2.3132: Recharge batteries on during off-peak demand periods $910 $2,500 - $910
-
kW-mo/yr
- - - -
07 2.7261: Install timers and/or thermostats $638 $1,000 - - $638
-
MMBtu
- - -
TOTAL RECOMMENDED $183,847 $50,616 $1,715
44,549
kWh
$2,516
-
kW-mo/yr
$638
-
MMBtu
$10,641
-
lb
$167,300 $1,037
TOTAL IMPLEMENTED $9,061 $1,000 - - $638
-
MMBtu
$7,386
-
lb
- $1,037
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs