| MZ0391 #07 Y:2025 | 07 | 2025 | Insulate glazing, walls, ceilings, and roofs | $10,402 | $145,860 |
n/a
|
| MZ0391 #06 Y:2025 | 06 | 2025 | Use solar heat to make electricty | $112,649 | $1,062,750 |
n/a
|
| MZ0391 #05 Y:2025 | 05 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $1,007 | - |
n/a
|
| MZ0391 #04 Y:2025 | 04 | 2025 | Use most efficient type of electric motors | $20,145 | $98,000 |
n/a
|
| MZ0391 #03 Y:2025 | 03 | 2025 | Lower temperature during the winter season and vice-versa | $4,207 | - |
n/a
|
| MZ0391 #02 Y:2025 | 02 | 2025 | Reduce the pressure of compressed air to the minimum required | $2,041 | $720 |
n/a
|
| MZ0391 #01 Y:2025 | 01 | 2025 | Replace heat treating oven with more efficient unit | $52,407 | $219,759 |
n/a
|
| UC2511 #09 Y:2025 | 09 | 2025 | Replace fossil fuel equipment with electrical equipment | $116,730 | $360,000 |
n/a
|
| UC2511 #08 Y:2025 | 08 | 2025 | Utilize controls to operate equipment only when needed | $6,726 | $75 |
n/a
|
| UC2511 #07 Y:2025 | 07 | 2025 | Use solar heat to make electricty | $225,469 | $2,423,010 |
n/a
|
| UC2511 #06 Y:2025 | 06 | 2025 | Insulate bare equipment | $3,267 | $2,180 |
n/a
|
| UC2511 #05 Y:2025 | 05 | 2025 | Recover waste heat from equipment | $22,999 | $8,485 |
n/a
|
| UC2511 #04 Y:2025 | 04 | 2025 | Use photocell controls | $6,789 | $14,000 |
n/a
|
| UC2511 #03 Y:2025 | 03 | 2025 | Install occupancy sensors | $6,520 | $10,625 |
n/a
|
| UC2511 #02 Y:2025 | 02 | 2025 | Install compressor air intakes in coolest locations | $2,290 | $2,200 |
n/a
|
| UC2511 #01 Y:2025 | 01 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,109 | $1,474 |
n/a
|
| MU0070 #14 Y:2025 | 14 | 2025 | Pay bills on time to avoid late fees | $178 | - |
n/a
|
| MU0070 #13 Y:2025 | 13 | 2025 | Use proper thickness of insulation on building envelope | $61 | $152 |
n/a
|
| MU0070 #12 Y:2025 | 12 | 2025 | Use proper thickness of insulation on building envelope | $185 | $352 |
n/a
|
| MU0070 #11 Y:2025 | 11 | 2025 | Close holes and openings in building such as broken windows | $6 | $65 |