Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Fabricated pipe and pipe fitting manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0072 #07 Y:2011 Repair faulty insulation in furnaces, boilers, etc $2,750 $415
UA0072 #06 Y:2011 Plant trees or shrubs near windows to shield from sunlight $3,939 $9,445
UA0072 #05 Y:2011 Use photocell controls $1,851 $1,030
UA0072 #04 Y:2011 Install occupancy sensors $6,856 $7,937
UA0072 #03 Y:2011 Reduce the pressure of compressed air to the minimum required $14,647 $80
UA0072 #02 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $16,742 $3,900
UA0072 #01 Y:2011 Recover waste heat from equipment $17,176 $2,039
UA0031 #08 Y:2008 Insulate bare equipment $350 $610
UA0031 #07 Y:2008 Recover waste heat from equipment $3,782 $1,385
UA0031 #06 Y:2008 Upgrade controls on compressors $1,573 $300
UA0031 #05 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $2,910 $1,500
UA0031 #04 Y:2008 Reduce the pressure of compressed air to the minimum required $2,868 -
UA0031 #03 Y:2008 Install timers and/or thermostats $2,044 $510
UA0031 #02 Y:2008 Use photocell controls $3,768 $1,894
UA0031 #01 Y:2008 Utilize higher efficiency lamps and/or ballasts $9,812 $41,878