17
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Ball and roller bearing manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0411 #04 Y:2010 | 04 | 2010 | Use radiant heater for spot heating | $2,081 | $3,392 | |
| WV0411 #03 Y:2010 | 03 | 2010 | Eliminate or reduce compressed air usage | $3,958 | $3,705 | |
| WV0411 #02 Y:2010 | 02 | 2010 | Recover waste heat from equipment | $11,172 | $6,123 | |
| WV0411 #01 Y:2010 | 01 | 2010 | Redesign process | $11,522 | $20,345 | |
| WV0390 #13 Y:2009 | 13 | 2009 | Eliminate leaks in inert gas and compressed air lines/ valves | $246 | $326 | |
| WV0390 #12 Y:2009 | 12 | 2009 | Install compressor air intakes in coolest locations | $1,219 | $582 | |
| WV0390 #11 Y:2009 | 11 | 2009 | Utilize higher efficiency lamps and/or ballasts | $2,238 | $4,744 | |
| WV0390 #10 Y:2009 | 10 | 2009 | Recover waste heat from equipment | $5,698 | $3,136 | |
| WV0390 #09 Y:2009 | 09 | 2009 | Reduce illumination to minimum necessary levels | $5,395 | - | |
| WV0390 #08 Y:2009 | 08 | 2009 | Reschedule plant operations or reduce load to avoid peaks | $10,650 | - | |
| WV0390 #07 Y:2009 | 07 | 2009 | Analyze flue gas for proper air/fuel ratio | $15,020 | $2,500 | |
| WV0390 #06 Y:2009 | 06 | 2009 | Use computer programs to optimize hvac performance | $15,354 | $2,490 | |
| WV0390 #05 Y:2009 | 05 | 2009 | Eliminate or reduce compressed air usage | $16,484 | $11,250 | |
| WV0390 #04 Y:2009 | 04 | 2009 | Use radiant heater for spot heating | $20,144 | $22,048 | |
| WV0390 #03 Y:2009 | 03 | 2009 | Optimize plant power factor | $20,264 | $4,490 | |
| WV0390 #02 Y:2009 | 02 | 2009 | Utilize higher efficiency lamps and/or ballasts | $29,790 | $72,987 | |
| WV0390 #01 Y:2009 | 01 | 2009 | Purchase new equipment to reduce material use / cost | $138,137 | $122,000 |