| Assessment Year | 2010 |
|---|---|
| Principal Product | Locomotive and Aerospace Bearings |
| NAICS | 332991: Ball and Roller Bearing Manufacturing |
| SIC | 3562: Ball and Roller Bearings |
| Sales Range | $50 M to 100M |
| # of Employees | 250 |
| Plant Area |
136,635
ft2
|
| Annual Production | 100,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $431,730 | 15,216,000 |
kWh
|
$0.028 |
| Electricity Demand | $369,284 | 28,680 |
kW-mo/yr
|
$12.88 |
| Electricity Fees | $3,420 | - |
|
- |
| Natural Gas | $302,309 | 29,636 |
MMBtu
|
$10.20 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $28,733 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,130 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.5194: Redesign process | $11,522 | $20,345 |
$1,991
70,173
kWh
|
$1,738
-
kW-mo/yr
|
$7,793
-
MMBtu
|
|
| 02 | 2.2437: Recover waste heat from equipment | $11,172 | $6,123 |
$(-91.0)
(-3,195)
kWh
|
$(-79.0)
-
kW-mo/yr
|
$11,342
-
MMBtu
|
|
| 03 | 2.4239: Eliminate or reduce compressed air usage | $3,958 | $3,705 |
$2,116
74,593
kWh
|
$1,842
-
kW-mo/yr
|
- | |
| 04 | 2.7231: Use radiant heater for spot heating | $2,081 | $3,392 | - | - |
$2,081
-
MMBtu
|
|
| TOTAL RECOMMENDED | $28,733 | $33,565 |
$4,016
141,571
kWh
|
$3,501
-
kW-mo/yr
|
$21,216
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $15,130 | $9,828 |
$2,025
71,398
kWh
|
$1,763
-
kW-mo/yr
|
$11,342
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs