Assessment Year | 2010 |
---|---|
Principal Product | Locomotive and Aerospace Bearings |
NAICS | 332991: Ball and Roller Bearing Manufacturing |
SIC | 3562: Ball and Roller Bearings |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
136,635
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $431,730 | 15,216,000 |
kWh
|
$0.028 |
Electricity Demand | $369,284 | 28,680 |
kW-mo/yr
|
$12.88 |
Electricity Fees | $3,420 | - |
|
- |
Natural Gas | $302,309 | 29,636 |
MMBtu
|
$10.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,733 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,130 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.5194: Redesign process | $11,522 | $20,345 |
$1,991
70,173
kWh
|
$1,738
-
kW-mo/yr
|
$7,793
-
MMBtu
|
|
02 | 2.2437: Recover waste heat from equipment | $11,172 | $6,123 |
$(-91.0)
(-3,195)
kWh
|
$(-79.0)
-
kW-mo/yr
|
$11,342
-
MMBtu
|
|
03 | 2.4239: Eliminate or reduce compressed air usage | $3,958 | $3,705 |
$2,116
74,593
kWh
|
$1,842
-
kW-mo/yr
|
- | |
04 | 2.7231: Use radiant heater for spot heating | $2,081 | $3,392 | - | - |
$2,081
-
MMBtu
|
|
TOTAL RECOMMENDED | $28,733 | $33,565 |
$4,016
141,571
kWh
|
$3,501
-
kW-mo/yr
|
$21,216
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,130 | $9,828 |
$2,025
71,398
kWh
|
$1,763
-
kW-mo/yr
|
$11,342
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs