ITAC Assessment: WV0411
ITAC logo
ITAC Assessment: WV0411
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Locomotive and Aerospace Bearings
NAICS 332991: Ball and Roller Bearing Manufacturing
SIC 3562: Ball and Roller Bearings
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 136,635
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $431,730 15,216,000
kWh
Electricity Demand $369,284 28,680
kW-mo/yr
Electricity Fees $3,420 -
Natural Gas $302,309 29,636
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,733 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,130

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.5194: Redesign process $11,522 $20,345 $1,991
70,173
kWh
$1,738
-
kW-mo/yr
$7,793
-
MMBtu
02 2.2437: Recover waste heat from equipment $11,172 $6,123 $(-91.0)
(-3,195)
kWh
$(-79.0)
-
kW-mo/yr
$11,342
-
MMBtu
03 2.4239: Eliminate or reduce compressed air usage $3,958 $3,705 $2,116
74,593
kWh
$1,842
-
kW-mo/yr
-
04 2.7231: Use radiant heater for spot heating $2,081 $3,392 - - $2,081
-
MMBtu
TOTAL RECOMMENDED $28,733 $33,565 $4,016
141,571
kWh
$3,501
-
kW-mo/yr
$21,216
-
MMBtu
TOTAL IMPLEMENTED $15,130 $9,828 $2,025
71,398
kWh
$1,763
-
kW-mo/yr
$11,342
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs