Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Ball and roller bearing manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0101 #02 Y:2018 Utilize energy-efficient belts and other improved mechanisms $232 $498
IP0101 #01 Y:2018 Utilize higher efficiency lamps and/or ballasts $25,806 $46,651
IP0099 #06 Y:2017 Insulate bare equipment $239 $603
IP0099 #05 Y:2017 Utilize energy-efficient belts and other improved mechanisms $2,103 $3,486
IP0099 #04 Y:2017 Utilize higher efficiency lamps and/or ballasts $3,723 $8,135
IP0099 #03 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $8,792 $275
IP0099 #02 Y:2017 Reduce the pressure of compressed air to the minimum required $1,245 $3
IP0099 #01 Y:2017 Lower temperature during the winter season and vice-versa $1,254 -
NL0016 #08 Y:2017 Meter recycled water (to reduce sewer charges) $2,200 -
NL0016 #07 Y:2017 Reschedule plant operations or reduce load to avoid peaks $9,600 $90,000
NL0016 #06 Y:2017 Utilize higher efficiency lamps and/or ballasts $18,700 $15,500
NL0016 #05 Y:2017 Utilize energy-efficient belts and other improved mechanisms $9,800 $1,000
NL0016 #04 Y:2017 Reschedule plant operations or reduce load to avoid peaks $10,600 $5,000
NL0016 #03 Y:2017 Meter recycled water (to reduce sewer charges) $33,100 -
NL0016 #02 Y:2017 Utilize higher efficiency lamps and/or ballasts $44,400 $160,000
NL0016 #01 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $47,000 $4,500
SU0434 #05 Y:2016 Utilize higher efficiency lamps and/or ballasts $1,250 $3,148
SU0434 #04 Y:2016 Utilize higher efficiency lamps and/or ballasts $469 $507
SU0434 #03 Y:2016 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $1,568 $2,420
SU0434 #02 Y:2016 Eliminate/reduce an operation $22,994 $2,160