ITAC Assessment: SU0434
ITAC logo
ITAC Assessment: SU0434
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Bearings
NAICS 332991: Ball and Roller Bearing Manufacturing
SIC 3562: Ball and Roller Bearings
Sales Range $10
M
to 50
M
# of Employees 188
Plant Area 96,000
ft2
Annual Production 15,000,000
units
Production Hrs. Annual 6,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,243 2,499,489
kWh
Electricity Demand $63,994 6,360
kW-mo/yr
Electricity Fees $6,489 -
Natural Gas $11,988 3,532
MMBtu
TOTAL YEARLY COSTS $165,714
RECOMMENDED SAVINGS* $27,849 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,037

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,568 - $1,568
52,254
kWh
- - -
02 3.1161: Eliminate/reduce an operation $22,994 $2,160 $(-312.0)
(-10,400)
kWh
$(-1,472.0)
-
kW-mo/yr
$10,400 $14,378
03 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $1,568 $2,420 $1,568
52,254
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $469 $507 $79
2,628
kWh
$37
-
kW-mo/yr
$160 $193
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,250 $3,148 $462
15,428
kWh
$491
-
kW-mo/yr
$144 $153
TOTAL RECOMMENDED $27,849 $8,235 $3,365
112,164
kWh
$(-944.0)
-
kW-mo/yr
$10,704 $14,724
TOTAL IMPLEMENTED $2,037 $2,927 $1,647
54,882
kWh
$37
-
kW-mo/yr
$160 $193
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs