Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143

matching recommendations
$
$
ARC 2+ Digits Required
NAICS All other fabricated metal product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0275 #10 Y:2004 Install equipment to move product $262,080 $80,000
BD0275 #09 Y:2004 Utilize higher efficiency lamps and/or ballasts $391 $360
BD0275 #08 Y:2004 Utilize energy-efficient belts and other improved mechanisms $1,053 $470
BD0275 #07 Y:2004 Use adjustable frequency drive or multiple speed motors on existing system $1,119 $6,000
BD0275 #06 Y:2004 Use most efficient type of electric motors $3,106 $6,980
BD0275 #05 Y:2004 Use waste heat from hot flue gases to preheat $3,674 $6,000
BD0275 #04 Y:2004 Install occupancy sensors $5,242 $3,150
BD0275 #03 Y:2004 Utilize higher efficiency lamps and/or ballasts $5,985 $421
BD0275 #02 Y:2004 Install replacement doors $13,598 $40,000
BD0275 #01 Y:2004 Use radiant heater for spot heating $40,891 $81,000
BD0273 #10 Y:2004 Utilize outside contracting $14,286 $200
BD0273 #09 Y:2004 Use plastic pallets instead of wood $22,476 $27,625
BD0273 #08 Y:2004 Reduce the pressure of compressed air to the minimum required $1,098 -
BD0273 #07 Y:2004 Recover waste heat from equipment $2,185 $2,900
BD0273 #06 Y:2004 Install occupancy sensors $2,608 $1,725
BD0273 #05 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $4,942 $255
BD0273 #04 Y:2004 Use most efficient type of electric motors $5,606 $4,270
BD0273 #03 Y:2004 Install timers on light switches in little used areas $6,786 $3,000
BD0273 #02 Y:2004 Install wind powered electric generator $10,682 $50,000
BD0273 #01 Y:2004 Utilize higher efficiency lamps and/or ballasts $12,813 $3,470