Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,645

matching recommendations
$
$
ARC 2+ Digits Required
NAICS All other fabricated metal product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LT8440 #03 Y:2025 Eliminate or reduce compressed air usage $8,679 $8,150
LT8440 #02 Y:2025 Use or replace with energy efficient substitutes $1,634 $1,887
LT8440 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $39,842 $6,028
NL0124 #05 Y:2025 Install compressor air intakes in coolest locations $1,720 $4,170
NL0124 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,696 $1,000
NL0124 #03 Y:2025 Install occupancy sensors $5,075 $11,340
NL0124 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $10,061 $11,590
NL0124 #01 Y:2025 Upgrade obsolete equipment $263,952 $875,540
UC2511 #09 Y:2025 Replace fossil fuel equipment with electrical equipment $116,730 $360,000
UC2511 #08 Y:2025 Utilize controls to operate equipment only when needed $6,726 $75
UC2511 #07 Y:2025 Use solar heat to make electricty $225,469 $2,423,010
UC2511 #06 Y:2025 Insulate bare equipment $3,267 $2,180
UC2511 #05 Y:2025 Recover waste heat from equipment $22,999 $8,485
UC2511 #04 Y:2025 Use photocell controls $6,789 $14,000
UC2511 #03 Y:2025 Install occupancy sensors $6,520 $10,625
UC2511 #02 Y:2025 Install compressor air intakes in coolest locations $2,290 $2,200
UC2511 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $7,109 $1,474
MU0070 #14 Y:2025 Pay bills on time to avoid late fees $178 -
MU0070 #13 Y:2025 Use proper thickness of insulation on building envelope $61 $152
MU0070 #12 Y:2025 Use proper thickness of insulation on building envelope $185 $352