Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

13

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Metal valve manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0063 #07 Y:2010 Install outside air damper / economizer on hvac unit $2,424 $120
TT0063 #06 Y:2010 Use cooling tower or economizer to replace chiller cooling $12,516 $4,000
TT0063 #05 Y:2010 Develop a repair/replace policy $8,057 $30,500
TT0063 #04 Y:2010 Recover heat from exhausted steam, hot air or hot water $900 $1,050
TT0063 #03 Y:2010 Remove or close off unneeded compressed air lines $1,238 -
TT0063 #02 Y:2010 Repair or replace steam traps $6,712 $4,800
TT0063 #01 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $339 -
LL0171 #06 Y:2003 Begin a practice of predictive / preventative maintenance $3,125 $318
LL0171 #05 Y:2003 Eliminate old stock and modify inventory control $1,170,000 $15,240
LL0171 #04 Y:2003 Utilize higher efficiency lamps and/or ballasts $1,189 $1,050
LL0171 #03 Y:2003 Reduce illumination to minimum necessary levels $2,316 $270
LL0171 #02 Y:2003 Install occupancy sensors $3,678 $364
LL0171 #01 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $7,294 $4,920