Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,378

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other fabricated metal product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0377 #08 Y:2025 Eliminate or reduce compressed air usage $1,503 $3,660
MZ0377 #07 Y:2025 Meter recycled water (to reduce sewer charges) $31,698 $9,040
MZ0377 #06 Y:2025 Use or replace with energy efficient substitutes $26,142 $43,500
MZ0377 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $769 $200
MZ0377 #04 Y:2025 Eliminate or reduce compressed air usage $4,340 $2,300
MZ0377 #03 Y:2025 Utilize energy-efficient belts and other improved mechanisms $871 -
MZ0377 #02 Y:2025 Install occupancy sensors $498 $415
MZ0377 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $7,928 $9,400
TR0069 #03 Y:2025 Install occupancy sensors $288 $812
TR0069 #02 Y:2025 Use solar heat to make electricty $136,380 $662,293
TR0069 #01 Y:2025 Use or replace with energy efficient substitutes $15,890 $37,400
LS2507 #04 Y:2024 Use or replace with energy efficient substitutes $12,714 $65,000
LS2507 #03 Y:2024 Replace fossil fuel equipment with electrical equipment $44,252 $192,732
LS2507 #02 Y:2024 Install sub-metering equipment $3,463 $3,000
LS2507 #01 Y:2024 Install timers and/or thermostats $1,382 $525
UF0625 #10 Y:2024 Improve space comfort conditioning $9,256 $2,512
UF0625 #09 Y:2024 Improve space comfort conditioning $31,920 $804
UF0625 #08 Y:2024 Modify facility to avoid excess maintenance costs $68,287 $300,000
UF0625 #07 Y:2024 Utilize energy-efficient belts and other improved mechanisms $710 -
UF0625 #06 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $1,573 $3,962