828
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Metal coating, engraving (except jewelry and silverware), and allied services to manufacturers | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OK1172 #07 Y:2026 | 07 | 2026 | Use solar heat to make electricty | $30,579 | $511,000 |
n/a
|
| OK1172 #06 Y:2026 | 06 | 2026 | Install timers and/or thermostats | $11,793 | $500 |
n/a
|
| OK1172 #05 Y:2026 | 05 | 2026 | Adjust burners for efficient operation | $1,716 | $1,300 |
n/a
|
| OK1172 #04 Y:2026 | 04 | 2026 | Redesign process | $51,525 | $143,270 |
n/a
|
| OK1172 #03 Y:2026 | 03 | 2026 | Replace boiler | $29,600 | $140,000 |
n/a
|
| OK1172 #02 Y:2026 | 02 | 2026 | Utilize higher efficiency lamps and/or ballasts | $12,656 | $19,265 |
n/a
|
| OK1172 #01 Y:2026 | 01 | 2026 | Shift from daytime to nighttime operation | $16,078 | - |
n/a
|
| IC0354 #12 Y:2026 | 12 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $10,666 | $14,100 |
n/a
|
| IC0354 #11 Y:2026 | 11 | 2026 | Contract a wood pallet recycling company | $27,720 | - |
n/a
|
| IC0354 #10 Y:2026 | 10 | 2026 | Lower temperature during the winter season and vice-versa | $246 | - |
n/a
|
| IC0354 #09 Y:2026 | 09 | 2026 | Install occupancy sensors | $467 | $995 |
n/a
|
| IC0354 #08 Y:2026 | 08 | 2026 | Install compressor air intakes in coolest locations | $21,191 | $36,000 |
n/a
|
| IC0354 #07 Y:2026 | 07 | 2026 | Utilize higher efficiency lamps and/or ballasts | $3,709 | $2,190 |
n/a
|
| IC0354 #06 Y:2026 | 06 | 2026 | Use or replace with energy efficient substitutes | $105,686 | $1,120 |
n/a
|
| IC0354 #05 Y:2026 | 05 | 2026 | Use or replace with energy efficient substitutes | $2,822 | $3,450 |
n/a
|
| IC0354 #04 Y:2026 | 04 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,736 | $4,400 |
n/a
|
| IC0354 #03 Y:2026 | 03 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $420 | $94 |
n/a
|
| IC0354 #02 Y:2026 | 02 | 2026 | Eliminate or reduce compressed air usage | $42,575 | $119,248 |
n/a
|
| IC0354 #01 Y:2026 | 01 | 2026 | Optimize plant power factor | $78,492 | $35,271 |
n/a
|
| MZ0401 #05 Y:2026 | 05 | 2026 | Re-use or recycle hot or cold process exhaust air | $737,920 | $540,000 |
n/a
|