Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,020

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Coating, engraving, heat treating, and allied activities
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0744 #09 Y:2006 Reduce the pressure of compressed air to the minimum required $731 -
UD0744 #08 Y:2006 Utilize daylight whenever possible in lieu of artificial light $1,657 $1,195
UD0744 #07 Y:2006 Use heat in flue gases to preheat products or materials $15,843 $3,000
UD0744 #06 Y:2006 Use optimum thickness insulation $17,062 $7,053
UD0744 #05 Y:2006 Utilize higher efficiency lamps and/or ballasts $24,118 $33,800
UD0744 #04 Y:2006 Use optimum thickness insulation $24,529 $14,670
UD0744 #03 Y:2006 Ventilation system to shut off when room is not in use $29,099 $50,000
UD0744 #02 Y:2006 Reduce combustion air flow to optimum $60,139 $400,400
UD0744 #01 Y:2006 Use heat in flue gases to preheat products or materials $67,027 $1,500
UM0301 #11 Y:2006 Recover waste heat from equipment $218 $500
UM0301 #10 Y:2006 Install compressor air intakes in coolest locations $1,062 $300
UM0301 #09 Y:2006 Utilize outside air instead of conditioned air for drying $328 $328
UM0301 #08 Y:2006 Lower light fixtures in high ceiling areas $1,415 $1,363
UM0301 #07 Y:2006 Utilize higher efficiency lamps and/or ballasts $3,325 -
UM0301 #06 Y:2006 Use separate switches on perimeter lighting which may be turned off when natural light is available $4,498 $738
UM0301 #05 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $7,457 $375
UM0301 #04 Y:2006 Analyze flue gas for proper air/fuel ratio $6,344 $500
UM0301 #03 Y:2006 Install / repair insulation on steam lines $6,429 $9,875
UM0301 #02 Y:2006 Insulate bare equipment $6,754 $1,971
UM0301 #01 Y:2006 Insulate bare equipment $9,958 $30,000