Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

180

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Spring manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0081 #09 Y:2016 Install occupancy sensors $201 $409
IP0081 #08 Y:2016 Utilize higher efficiency lamps and/or ballasts $832 $1,358
IP0081 #07 Y:2016 Enhance sensitivity of temperature control and cutoff $1,643 $1,949
IP0081 #06 Y:2016 Insulate glazing, walls, ceilings, and roofs $25 $17
IP0081 #05 Y:2016 Utilize energy-efficient belts and other improved mechanisms $1,865 $390
IP0081 #04 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $2,798 $35
IP0081 #03 Y:2016 Turn off equipment when not in use $72 -
IP0081 #02 Y:2016 Use or replace with energy efficient substitutes $1,216 -
IP0081 #01 Y:2016 Lower temperature during the winter season and vice-versa $1,110 -
SU0421 #07 Y:2016 Install occupancy sensors $59 $290
SU0421 #06 Y:2016 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $848 $3,260
SU0421 #05 Y:2016 Conserve energy by efficient use of vending machines $123 $427
SU0421 #04 Y:2016 Eliminate/reduce an operation $3,431 $3,650
SU0421 #03 Y:2016 Utilize higher efficiency lamps and/or ballasts $73 $74
SU0421 #02 Y:2016 Utilize higher efficiency lamps and/or ballasts $554 $340
SU0421 #01 Y:2016 Utilize controls to operate equipment only when needed $31 -
SF0462 #09 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $2,227 $11,712
SF0462 #08 Y:2015 Utilize higher efficiency lamps and/or ballasts $5,459 $24,914
SF0462 #07 Y:2015 Install occupancy sensors $2,234 $4,284
SF0462 #06 Y:2015 Re-size charging openings or add a movable door on equipment $601 $1,000