Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Spring and wire product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK0821 #11 Y:2011 Optimize plant power factor $19,001 $9,750
OK0821 #10 Y:2011 Install / repair insulation on steam lines $2,699 $3,135
OK0821 #09 Y:2011 Replace boiler $21,929 $26,400
OK0821 #08 Y:2011 Reduce the pressure of compressed air to the minimum required $5,301 -
OK0821 #07 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $8,375 $1,700
OK0821 #06 Y:2011 Upgrade controls on compressors $17,137 -
OK0821 #05 Y:2011 Utilize higher efficiency lamps and/or ballasts $2,712 $15,478
OK0821 #04 Y:2011 Utilize higher efficiency lamps and/or ballasts $4,847 $15,486
OK0821 #03 Y:2011 Utilize higher efficiency lamps and/or ballasts $2,363 $2,514
OK0821 #02 Y:2011 Install outside air damper / economizer on hvac unit $3,466 $2,840
OK0821 #01 Y:2011 Use adjustable frequency drive or multiple speed motors on existing system $43,921 $24,480
IA0466 #09 Y:2011 Improve combustion control capability $482 $480
IA0466 #08 Y:2011 Use radiant heater for spot heating $8,615 $16,800
IA0466 #07 Y:2011 Install occupancy sensors $343 $308
IA0466 #06 Y:2011 Utilize higher efficiency lamps and/or ballasts $4,604 $11,597
IA0466 #05 Y:2011 Utilize higher efficiency lamps and/or ballasts $2,338 $6,607
IA0466 #04 Y:2011 Reduce illumination to minimum necessary levels $199 $35
IA0466 #03 Y:2011 Reduce the pressure of compressed air to the minimum required $224 $25
IA0466 #02 Y:2011 Install compressor air intakes in coolest locations $159 $310
IA0466 #01 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $2,117 $500