| Assessment Year | 2011 |
|---|---|
| Principal Product | Coiled Steel Springs |
| NAICS | 332613: Spring Manufacturing |
| SIC | 3495: Wire Springs |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
100,000
ft2
|
| Annual Production | 17,067,111
lb
|
| Production Hrs. Annual | 5,329
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $55,229 | 1,564,500 |
kWh
|
$0.035 |
| Electricity Demand | $27,854 | 4,752 |
kW-mo/yr
|
$5.86 |
| Electricity Fees | $2,549 | - |
|
- |
| Natural Gas | $59,679 | 11,139 |
MMBtu
|
$5.36 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $19,081 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,242 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,117 | $500 |
$1,452
41,147
kWh
|
$665
-
kW-mo/yr
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $159 | $310 |
$113
3,194
kWh
|
$46
-
kW-mo/yr
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $224 | $25 |
$154
4,368
kWh
|
$70
-
kW-mo/yr
|
- | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $199 | $35 |
$150
4,359
kWh
|
$49
-
kW-mo/yr
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,338 | $6,607 |
$1,470
41,670
kWh
|
$868
-
kW-mo/yr
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,604 | $11,597 |
$3,160
89,544
kWh
|
$1,444
-
kW-mo/yr
|
- | |
| 07 | 2.7135: Install occupancy sensors | $343 | $308 |
$343
10,099
kWh
|
- | - | |
| 08 | 2.7231: Use radiant heater for spot heating | $8,615 | $16,800 | - | - |
$8,615
-
MMBtu
|
|
| 09 | 2.1116: Improve combustion control capability | $482 | $480 | - | - |
$482
-
MMBtu
|
|
| TOTAL RECOMMENDED | $19,081 | $36,662 |
$6,842
194,381
kWh
|
$3,142
-
kW-mo/yr
|
$9,097
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $10,242 | $19,837 |
$6,688
190,013
kWh
|
$3,072
-
kW-mo/yr
|
$482
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs