Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

523

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Spring and wire product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0221 #10 Y:2023 Use properly designed and sized hvac equipment $4,279 $1,500
DL0221 #09 Y:2023 Air condition only space necessary $2,678 $610
DL0221 #08 Y:2023 Install timers and/or thermostats $75 $200
DL0221 #07 Y:2023 Install timers and/or thermostats $4,684 $500
DL0221 #06 Y:2023 Lower temperature during the winter season and vice-versa $293 -
DL0221 #05 Y:2023 Improve air circulation with destratification fans / other methods $740 $1,500
DL0221 #04 Y:2023 Minimize use of outside make-up air for ventilation except when used for economizer cycle $781 -
DL0221 #03 Y:2023 Utilize controls to operate equipment only when needed $4,286 $3,000
DL0221 #02 Y:2023 Turn off equipment during breaks, reduce operating time $30,683 -
DL0221 #01 Y:2023 Turn off equipment during breaks, reduce operating time $6,723 -
LT8362 #07 Y:2022 Reduce space conditioning during non-working hours $223 $180
LT8362 #06 Y:2022 Lower temperature during the winter season and vice-versa $3,938 -
LT8362 #05 Y:2022 Upgrade controls on compressors $10,089 -
LT8362 #04 Y:2022 Replace fossil fuel equipment with electrical equipment $808 $29,000
LT8362 #03 Y:2022 Reduce illumination to minimum necessary levels $5,079 -
LT8362 #02 Y:2022 Utilize higher efficiency lamps and/or ballasts $21,493 $30,000
LT8362 #01 Y:2022 Change rate schedules or other changes in utility service $673 -
AM0852 #09 Y:2022 Use synthetic lubricant $4,070 $540
AM0852 #08 Y:2022 Reduce the pressure of compressed air to the minimum required $3,170 $35
AM0852 #07 Y:2022 Use photocell controls $89 $91