453
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | Metal can manufacturing | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
WM0229 #06 Y:2024 | 06 | 2024 | Utilize higher efficiency lamps and/or ballasts | $267 | $129 |
n/a
|
WM0229 #05 Y:2024 | 05 | 2024 | Install compressor air intakes in coolest locations | $476 | $460 |
n/a
|
WM0229 #04 Y:2024 | 04 | 2024 | Reduce space conditioning during non-working hours | $1,572 | - |
n/a
|
WM0229 #03 Y:2024 | 03 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $2,880 | $1,455 |
n/a
|
WM0229 #02 Y:2024 | 02 | 2024 | Reduce the pressure of compressed air to the minimum required | $4,336 | - |
n/a
|
WM0229 #01 Y:2024 | 01 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,865 | $3,500 |
n/a
|
MZ0366 #05 Y:2024 | 05 | 2024 | Use solar heat to make electricty | $147,343 | $2,297,063 |
n/a
|
MZ0366 #04 Y:2024 | 04 | 2024 | Replace existing chiller with high efficiency model | $11,668 | $59,968 |
n/a
|
MZ0366 #03 Y:2024 | 03 | 2024 | Install compressor air intakes in coolest locations | $3,674 | $14,000 |
n/a
|
MZ0366 #02 Y:2024 | 02 | 2024 | Reduce the pressure of compressed air to the minimum required | $9,395 | $800 |
n/a
|
MZ0366 #01 Y:2024 | 01 | 2024 | Replace treated water with well / surface water | $21,410 | $168,000 |
n/a
|
NL0096 #10 Y:2024 | 10 | 2024 | Utilize higher efficiency lamps and/or ballasts | $364 | $172 |
n/a
|
NL0096 #09 Y:2024 | 09 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $4,634 | $1,540 |
n/a
|
NL0096 #08 Y:2024 | 08 | 2024 | Use waste heat from hot flue gases to preheat | $5,899 | $11,800 |
n/a
|
NL0096 #07 Y:2024 | 07 | 2024 | Utilize higher efficiency lamps and/or ballasts | $12,185 | $29,089 |
n/a
|
NL0096 #06 Y:2024 | 06 | 2024 | Install compressor air intakes in coolest locations | $15,679 | $4,600 |
n/a
|
NL0096 #05 Y:2024 | 05 | 2024 | Recharge batteries on during off-peak demand periods | $20,701 | $600 |
n/a
|
NL0096 #04 Y:2024 | 04 | 2024 | Apply for tax-free status for energy purchases | $37,143 | $3,000 |
n/a
|
NL0096 #03 Y:2024 | 03 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $40,407 | $21,500 |
n/a
|
NL0096 #02 Y:2024 | 02 | 2024 | Improve air circulation with destratification fans / other methods | $45,060 | $54,620 |
n/a
|