ITAC Assessment: MZ0383
ITAC logo
ITAC Assessment: MZ0383
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product metal cans
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 155,000
ft2
Annual Production 468,585,804
pieces
Production Hrs. Annual 8,160
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $487,056 12,612,740
kWh
Electricity Demand $743,144 25,004
kW-mo/yr
Natural Gas $34,245 5,905
MMBtu
Waste Disposal Costs
Water Usage $8,587 2,057
Tgal
TOTAL YEARLY COSTS $1,273,032
RECOMMENDED SAVINGS* $195,653 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $171,168 $25,350 $5,442
139,500
kWh
$165,726
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $15,650 $720 $7,686
197,094
kWh
$7,964
-
kW-mo/yr
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,175 - $515
13,174
kWh
$660
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,190 $500 $1,588
36,654
kWh
$1,602
-
kW-mo/yr
-
05 2.6127: Maintain air filters by cleaning or replacement $1,301 $500 $1,301
33,382
kWh
- -
06 2.7221: Lower temperature during the winter season and vice-versa $3,169 $1,400 $1,302
33,393
kWh
- $1,867
-
MMBtu
TOTAL RECOMMENDED $195,653 $28,470 $17,834
453,197
kWh
$175,952
-
kW-mo/yr
$1,867
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs