Assessment Year | 1988 |
---|---|
Principal Product | BOATS & CONVERSION VANS |
NAICS |
n/a
|
SIC | 3732: Boat Building and Repairing |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
n/a
|
Annual Production | 10,562
pieces
|
Production Hrs. Annual | 2,405
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $106,976 | 1,677,022 |
kWh
|
$0.064 |
Natural Gas | $76,938 | 19,245 |
MMBtu
|
$4.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,302 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,400 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $757 | $315 |
$817
12,603
kWh
|
- | $(-60.0) | |
02 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $1,670 | $4,560 |
$1,670
33,998
kWh
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $777 | - |
$777
11,137
kWh
|
- | - | |
04 | 2.7261: Install timers and/or thermostats | $378 | $133 |
$288
5,862
kWh
|
$90
-
MMBtu
|
- | |
05 | 2.7229: Air condition only space necessary | $9,160 | $9,110 | - |
$9,160
-
MMBtu
|
- | |
06 | 2.7261: Install timers and/or thermostats | $4,760 | $400 | - |
$4,760
-
MMBtu
|
- | |
07 | 2.7243: Improve air circulation with destratification fans / other methods | $11,900 | $5,500 | - |
$11,900
-
MMBtu
|
- | |
08 | 2.7231: Use radiant heater for spot heating | $3,500 | $1,860 | - |
$3,500
-
MMBtu
|
- | |
09 | 2.2437: Recover waste heat from equipment | $1,400 | $450 | - |
$1,400
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $34,302 | $22,328 |
$3,552
63,600
kWh
|
$30,810
-
MMBtu
|
$(-60.0) | ||
TOTAL IMPLEMENTED | $1,400 | $450 | - |
$1,400
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs