| Assessment Year | 1985 |
|---|---|
| Principal Product | COATING OF METAL PARTS |
| NAICS |
n/a
|
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $1 M to 5M |
| # of Employees | 35 |
| Plant Area |
n/a
|
| Annual Production | 2,080
Tgal
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $58,976 | 745,897 |
kWh
|
$0.079 |
| Natural Gas | $1,258 | 181 |
MMBtu
|
$6.95 |
| Fuel Oil #4 | $10,324 | 1,675 |
MMBtu
|
$6.16 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $15,679 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,622 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #4 Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $787 | $450 |
$787
9,965
kWh
|
- | - | - | |
| 02 | 2.2437: Recover waste heat from equipment | $756 | $750 | - | - |
$756
-
MMBtu
|
- | |
| 03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $5,100 | $5,110 |
$7,887
99,941
kWh
|
$(-2,787.0)
-
MMBtu
|
- | - | |
| 04 | 2.2511: Insulate bare equipment | $1,515 | $2,816 | - |
$1,515
-
MMBtu
|
- | - | |
| 05 | 2.2437: Recover waste heat from equipment | $4,896 | $7,546 |
$(-116.0)
(-1,465)
kWh
|
- |
$5,012
-
MMBtu
|
- | |
| 06 | 2.2113: Repair or replace steam traps | $661 | $500 | - | - |
$661
-
MMBtu
|
- | |
| 07 | 2.6212: Turn off equipment during breaks, reduce operating time | $573 | $11 |
$65
879
kWh
|
- |
$508
-
MMBtu
|
- | |
| 08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $546 | $1,329 |
$695
8,792
kWh
|
$(-250.0)
-
MMBtu
|
- | $101 | |
| 09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $845 | $1,100 | - | - |
$845
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $15,679 | $19,612 |
$9,318
118,112
kWh
|
$(-1,522.0)
-
MMBtu
|
$7,782
-
MMBtu
|
$101 | ||
| TOTAL IMPLEMENTED | $3,622 | $2,811 |
$852
10,844
kWh
|
- |
$2,770
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #4 Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs