Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Metal can, box, and other metal container (light gauge) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0429 #07 Y:2013 Install compressor air intakes in coolest locations $226 $700
BD0429 #06 Y:2013 Use most efficient type of electric motors $354 $440
BD0429 #05 Y:2013 Adjust / maintain fork lift trucks for most efficient operation $651 $2,300
BD0429 #04 Y:2013 Reduce the pressure of compressed air to the minimum required $666 $25
BD0429 #03 Y:2013 Recharge batteries on during off-peak demand periods $1,152 $30
BD0429 #02 Y:2013 Utilize higher efficiency lamps and/or ballasts $1,306 $5,680
BD0429 #01 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $12,975 $200
BD0330 #11 Y:2007 Convert to high volume low pressure (hvlp) paint guns $307,692 $5,801
BD0330 #10 Y:2007 Use radiant heater for spot heating $81,923 -
BD0330 #09 Y:2007 Install compressor air intakes in coolest locations $621 -
BD0330 #08 Y:2007 Reduce the pressure of compressed air to the minimum required $442 $2
BD0330 #07 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $2,489 $501
BD0330 #06 Y:2007 Recover waste heat from equipment $1,117 -
BD0330 #05 Y:2007 Utilize higher efficiency lamps and/or ballasts $160 $126
BD0330 #04 Y:2007 Utilize daylight whenever possible in lieu of artificial light $2,578 -
BD0330 #03 Y:2007 Install occupancy sensors $1,189 $2,100
BD0330 #02 Y:2007 Utilize higher efficiency lamps and/or ballasts $3,225 $8,850
BD0330 #01 Y:2007 Utilize higher efficiency lamps and/or ballasts $6,133 $5,400