| Assessment Year | 2025 |
|---|---|
| Principal Product | Steel Drums |
| NAICS | 332439: Other Metal Container Manufacturing |
| SIC | 3412: Metal Shipping Barrels, Drums, Kegs, and Pails |
| Sales Range | $10 M to 50M |
| # of Employees | 30 |
| Plant Area |
35,000
ft2
|
| Annual Production | 289,413
pieces
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $279,195 | 2,176,164 |
kWh
|
$0.13 | |
| Electricity Demand | $123,443 | 8,098 |
kW-mo/yr
|
$15.24 | |
| Electricity Fees | $38,515 | - |
|
- | |
| Natural Gas | $153,217 | 19,528 |
MMBtu
|
$7.85 | |
| LPG | $12,000 | 403 |
MMBtu
|
$29.78 | |
| Other Gas | $44,766 | 1 |
MMBtu
|
$44,766.00 | |
| Waste Disposal Costs | |||||
| Water Usage | $3,730 | 720 |
Tgal
|
$5.18 | |
| Water Disposal | $130 | 720 |
Tgal
|
$0.18 | |
| Other Liquid (haz) | $19,320 | 12,288 |
gal
|
$1.57 | |
| Solid Waste (non-haz) | $138,707 | 1 |
lb
|
$138,707.00 | |
| TOTAL YEARLY COSTS | $813,023 | ||||
| RECOMMENDED SAVINGS* | $404,281 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Other Liquid (haz) Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.611: Begin a practice of predictive / preventative maintenance | $240,000 | $100,000 | - | - | - | - | - | $240,000 | |
| 02 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $47,104 | $22,000 | - | - | - | - |
$47,104
-
gal
|
- | |
| 03 | 2.9114: Use solar heat to make electricty | $37,161 | $312,500 |
$30,760
239,750
kWh
|
$6,401
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 2.1331: Burn a less expensive grade of fuel | $34,014 | $125,000 | - | - |
$34,014
-
MMBtu
|
- | - | - | |
| 05 | 2.2437: Recover waste heat from equipment | $14,481 | $6,000 | - | - |
$14,481
-
MMBtu
|
- | - | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $14,374 | $800 |
$9,095
70,892
kWh
|
$5,279
-
kW-mo/yr
|
- | - | - | - | |
| 07 | 2.4133: Use most efficient type of electric motors | $5,929 | $10,440 |
$4,483
34,942
kWh
|
$1,446
-
kW-mo/yr
|
- | - | - | - | |
| 08 | 2.8227: Adjust / maintain fork lift trucks for most efficient operation | $7,997 | $6,000 |
$(-4,003.0)
(-31,200)
kWh
|
- | - |
$12,000
-
MMBtu
|
- | - | |
| 09 | 2.2622: Replace existing chiller with high efficiency model | $2,407 | $12,000 |
$2,407
18,762
kWh
|
- | - | - | - | - | |
| 10 | 2.7134: Use photocell controls | $814 | $450 |
$367
2,857
kWh
|
$447
-
kW-mo/yr
|
- | - | - | - | |
| TOTAL RECOMMENDED | $404,281 | $595,190 |
$43,109
336,003
kWh
|
$13,573
-
kW-mo/yr
|
$48,495
-
MMBtu
|
$12,000
-
MMBtu
|
$47,104
-
gal
|
$240,000 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Other Liquid (haz) Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs