ITAC Assessment: CI0062
ITAC logo
ITAC Assessment: CI0062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Steel Drums
NAICS 332439: Other Metal Container Manufacturing
SIC 3412: Metal Shipping Barrels, Drums, Kegs, and Pails
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 35,000
ft2
Annual Production 289,413
pieces
Production Hrs. Annual 2,210
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $279,195 2,176,164
kWh
Electricity Demand $123,443 8,098
kW-mo/yr
Electricity Fees $38,515 -
Natural Gas $153,217 19,528
MMBtu
LPG $12,000 403
MMBtu
Other Gas $44,766 1
MMBtu
Waste Disposal Costs
Water Usage $3,730 720
Tgal
Water Disposal $130 720
Tgal
Other Liquid (haz) $19,320 12,288
gal
Solid Waste (non-haz) $138,707 1
lb
TOTAL YEARLY COSTS $813,023
RECOMMENDED SAVINGS* $404,281 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Other Liquid (haz) Savings One-time Revenue or Avoided Cost Savings
01 4.611: Begin a practice of predictive / preventative maintenance $240,000 $100,000 - - - - - $240,000
02 3.2123: Convert to high volume low pressure (hvlp) paint guns $47,104 $22,000 - - - - $47,104
-
gal
-
03 2.9114: Use solar heat to make electricty $37,161 $312,500 $30,760
239,750
kWh
$6,401
-
kW-mo/yr
- - - -
04 2.1331: Burn a less expensive grade of fuel $34,014 $125,000 - - $34,014
-
MMBtu
- - -
05 2.2437: Recover waste heat from equipment $14,481 $6,000 - - $14,481
-
MMBtu
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,374 $800 $9,095
70,892
kWh
$5,279
-
kW-mo/yr
- - - -
07 2.4133: Use most efficient type of electric motors $5,929 $10,440 $4,483
34,942
kWh
$1,446
-
kW-mo/yr
- - - -
08 2.8227: Adjust / maintain fork lift trucks for most efficient operation $7,997 $6,000 $(-4,003.0)
(-31,200)
kWh
- - $12,000
-
MMBtu
- -
09 2.2622: Replace existing chiller with high efficiency model $2,407 $12,000 $2,407
18,762
kWh
- - - - -
10 2.7134: Use photocell controls $814 $450 $367
2,857
kWh
$447
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $404,281 $595,190 $43,109
336,003
kWh
$13,573
-
kW-mo/yr
$48,495
-
MMBtu
$12,000
-
MMBtu
$47,104
-
gal
$240,000
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Other Liquid (haz) Savings One-time Revenue or Avoided Cost Savings