ITAC Assessment: UD0535
ITAC logo
ITAC Assessment: UD0535
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Lubricants Oils, Calcium Oxide
NAICS
n/a
SIC 2589:
Sales Range $5
M
to 10
M
# of Employees 42
Plant Area 40,000
ft2
Annual Production 13,000,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,842 776,671
kWh
Electricity Demand $36,330 3,000
kW-mo/yr
Natural Gas $32,208 5,268
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $120,354 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,874

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Personnel Changes Savings
01 4.652: Replace existing equipment with more suitable substitutes $104,625 $25,000 - - - $104,625
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,064 $43,075 $2,903
90,856
kWh
$5,859
-
kW-mo/yr
- $302
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,333 $9,720 $1,104
34,584
kWh
$2,229
-
kW-mo/yr
- -
04 3.5316: Contract a wood pallet recycling company $1,810 - - - - $1,810
05 3.3133: Use other waste concentration methods $1,522 $500 - - $1,770
-
lb
$(-248.0)
TOTAL RECOMMENDED $120,354 $78,295 $4,007
125,440
kWh
$8,088
-
kW-mo/yr
$1,770
-
lb
$106,489
TOTAL IMPLEMENTED $10,874 $43,075 $2,903
90,856
kWh
$5,859
-
kW-mo/yr
- $2,112
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs