Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

124

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Ornamental and architectural metal work manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UC2401 #09 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $719 $1,986
UC2401 #08 Y:2024 Use or replace with energy efficient substitutes $614 $2,242
UC2401 #07 Y:2024 Install timers and/or thermostats $1,271 $653
UC2401 #06 Y:2024 Use solar heat to make electricty $26,744 $134,289
UC2401 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $612 $1,300
UC2401 #04 Y:2024 Reduce the pressure of compressed air to the minimum required $935 $150
UC2401 #03 Y:2024 Use proper thickness of insulation on building envelope $8,586 $48,007
UC2401 #02 Y:2024 Change rate schedules or other changes in utility service $8,715 -
UC2401 #01 Y:2024 Apply for tax-free status for energy purchases $6,791 -
LT8374 #04 Y:2023 Turn off equipment during breaks, reduce operating time $24,154 -
LT8374 #03 Y:2023 Install equipment (eg compactor) to reduce disposal costs $30,878 $16,400
LT8374 #02 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $96 $350
LT8374 #01 Y:2023 Utilize higher efficiency lamps and/or ballasts $9,966 $9,823
OK1040 #04 Y:2020 Recover waste heat from equipment $2,152 $4,457
OK1040 #03 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $3,923 $2,911
OK1040 #02 Y:2020 Utilize higher efficiency lamps and/or ballasts $25,167 $70,338
OK1040 #01 Y:2020 Optimize plant power factor $83,427 $407,400
BS0121 #08 Y:2019 Install compressor air intakes in coolest locations $257 $56
BS0121 #07 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $1,509 $810
BS0121 #06 Y:2019 Install occupancy sensors $354 $796