ITAC Assessment: LT8374
ITAC logo
ITAC Assessment: LT8374
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Aluminum Products (Decorative facade systems
NAICS 332323: Ornamental and Architectural Metal Work Manufacturing
SIC 3446: Architectural and Ornamental Metal Work
Sales Range $50
M
to 100
M
# of Employees 160
Plant Area 255,000
ft2
Annual Production 500
units
Production Hrs. Annual 2,080
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $276,823 2,199,000
kWh
Electricity Demand $64,875 6,173
kW-mo/yr
Waste Disposal Costs
Water Usage $7,114 1,089
Tgal
Water Disposal $7,822 1,197
Tgal
TOTAL YEARLY COSTS $356,634
RECOMMENDED SAVINGS* $65,094 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,966 $9,823 $6,725
53,460
kWh
$3,241
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $96 $350 $96
762
kWh
- -
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $30,878 $16,400 $(-10.1)
(-80)
kWh
- $30,888
04 2.6212: Turn off equipment during breaks, reduce operating time $24,154 - $24,154
192,004
kWh
- -
TOTAL RECOMMENDED $65,094 $26,573 $30,965
246,146
kWh
$3,241
-
kW-mo/yr
$30,888
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs