ITAC Assessment: SF0239
ITAC logo
ITAC Assessment: SF0239
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Semiconductor Manufacturing Equipment
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 65,000
ft2
Annual Production 200
units
Production Hrs. Annual 3,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $374,074 3,414,680
kWh
Electricity Demand $92,541 9,603
kW-mo/yr
Natural Gas $26,751 2,554
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,707 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $4,912 - $4,912
28,410
kWh
-
02 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation $8,588 $460 $8,588
69,546
kWh
-
03 2.5123: Reduce fluid flow rates $34,956 $25,339 $34,956
283,046
kWh
-
04 2.7135: Install occupancy sensors $324 $480 $324
2,018
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $12,127 $33,923 $12,127
81,211
kWh
-
06 3.5217: Reuse / recycle/ sell paper products $20,800 - - $20,800
-
lb
TOTAL RECOMMENDED $81,707 $60,202 $60,907
464,231
kWh
$20,800
-
lb
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs