Assessment Year | 1997 |
---|---|
Principal Product | Small Engines |
NAICS |
n/a
|
SIC | 3519: Internal Combustion Engines, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 350 |
Plant Area |
252,000
ft2
|
Annual Production | 539,250
pieces
|
Production Hrs. Annual | 8,232
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Demand | $574,646 | 54,332 |
kW-mo/yr
|
$10.58 |
Electricity Fees | $100,349 | - |
|
- |
Natural Gas | $349,326 | 68,290 |
MMBtu
|
$5.12 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $347,402 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $344,524 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water | $216,153 | $80,000 | - | - |
$216,153
-
gal
|
- | |
02 | 3.4115: Recover and reuse cooling water | $20,939 | $19,000 | - | - |
$20,939
-
gal
|
- | |
03 | 4.432: Cross-train personnel to avoid lost time | $25,800 | $20,000 | - | - | - | $25,800 | |
04 | 4.711: Initiate a total quality management program | $18,045 | $15,000 | - | - | - | $18,045 | |
05 | 4.514: Re-arrange equipment layout to reduce handling costs | $10,080 | $10,000 | - | - | - | $10,080 | |
06 | 4.611: Begin a practice of predictive / preventative maintenance | $4,940 | $9,500 | - | - | - | $4,940 | |
07 | 2.7124: Make a practice of turning off lights when not needed | $38,120 | $550 |
$38,120
1,279,601
kWh
|
- | - | - | |
08 | 2.4133: Use most efficient type of electric motors | $10,447 | $28,282 |
$7,070
237,397
kWh
|
$3,377
-
kW-mo/yr
|
- | - | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,878 | $80 |
$2,246
75,322
kWh
|
$632
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $347,402 | $182,412 |
$47,436
1,592,320
kWh
|
$4,009
-
kW-mo/yr
|
$237,092
-
gal
|
$58,865 | ||
TOTAL IMPLEMENTED | $344,524 | $182,332 |
$45,190
1,516,998
kWh
|
$3,377
-
kW-mo/yr
|
$237,092
-
gal
|
$58,865 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs