Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

411

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Metal window and door manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NL0070 #08 Y:2022 Utilize higher efficiency lamps and/or ballasts $490 $854
NL0070 #07 Y:2022 Utilize energy-efficient belts and other improved mechanisms $675 $3,315
NL0070 #06 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $3,590 $23,500
NL0070 #05 Y:2022 Install compressor air intakes in coolest locations $4,030 $4,945
NL0070 #04 Y:2022 Avoid introducing hot, humid, or dirty air into hvac system $6,619 $1,180
NL0070 #03 Y:2022 Reschedule plant operations or reduce load to avoid peaks $26,148 $35
NL0070 #02 Y:2022 Upgrade controls on compressors $32,832 $16,500
NL0070 #01 Y:2022 Use radiant heater for spot heating $41,224 $20,136
TT0280 #10 Y:2022 Develop a repair/replace policy $298 $1,247
TT0280 #09 Y:2022 Turn off equipment during breaks, reduce operating time $1,550 -
TT0280 #08 Y:2022 Utilize energy-efficient belts and other improved mechanisms $2,072 $3,400
TT0280 #07 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $2,878 $5,100
TT0280 #06 Y:2022 Install timers and/or thermostats $14,562 $650
TT0280 #05 Y:2022 Replace fossil fuel equipment with electrical equipment $19,766 -
TT0280 #04 Y:2022 Turn off equipment when not in use $21,150 -
TT0280 #03 Y:2022 Utilize controls to operate equipment only when needed $26,518 $6,720
TT0280 #02 Y:2022 Substitute compressed air cooling with water or air cooling $29,003 $9,880
TT0280 #01 Y:2022 Modify process to reduce material use/cost $52,932 $4,800
IP0157 #09 Y:2022 Use waste heat from hot flue gases to preheat $12,808 $16,500
IP0157 #08 Y:2022 Use most efficient type of electric motors $6,868 $7,911