411
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Metal window and door manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NL0070 #08 Y:2022 | 08 | 2022 | Utilize higher efficiency lamps and/or ballasts | $490 | $854 | |
| NL0070 #07 Y:2022 | 07 | 2022 | Utilize energy-efficient belts and other improved mechanisms | $675 | $3,315 | |
| NL0070 #06 Y:2022 | 06 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,590 | $23,500 | |
| NL0070 #05 Y:2022 | 05 | 2022 | Install compressor air intakes in coolest locations | $4,030 | $4,945 | |
| NL0070 #04 Y:2022 | 04 | 2022 | Avoid introducing hot, humid, or dirty air into hvac system | $6,619 | $1,180 | |
| NL0070 #03 Y:2022 | 03 | 2022 | Reschedule plant operations or reduce load to avoid peaks | $26,148 | $35 | |
| NL0070 #02 Y:2022 | 02 | 2022 | Upgrade controls on compressors | $32,832 | $16,500 | |
| NL0070 #01 Y:2022 | 01 | 2022 | Use radiant heater for spot heating | $41,224 | $20,136 | |
| TT0280 #10 Y:2022 | 10 | 2022 | Develop a repair/replace policy | $298 | $1,247 | |
| TT0280 #09 Y:2022 | 09 | 2022 | Turn off equipment during breaks, reduce operating time | $1,550 | - | |
| TT0280 #08 Y:2022 | 08 | 2022 | Utilize energy-efficient belts and other improved mechanisms | $2,072 | $3,400 | |
| TT0280 #07 Y:2022 | 07 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $2,878 | $5,100 | |
| TT0280 #06 Y:2022 | 06 | 2022 | Install timers and/or thermostats | $14,562 | $650 | |
| TT0280 #05 Y:2022 | 05 | 2022 | Replace fossil fuel equipment with electrical equipment | $19,766 | - | |
| TT0280 #04 Y:2022 | 04 | 2022 | Turn off equipment when not in use | $21,150 | - | |
| TT0280 #03 Y:2022 | 03 | 2022 | Utilize controls to operate equipment only when needed | $26,518 | $6,720 | |
| TT0280 #02 Y:2022 | 02 | 2022 | Substitute compressed air cooling with water or air cooling | $29,003 | $9,880 | |
| TT0280 #01 Y:2022 | 01 | 2022 | Modify process to reduce material use/cost | $52,932 | $4,800 | |
| IP0157 #09 Y:2022 | 09 | 2022 | Use waste heat from hot flue gases to preheat | $12,808 | $16,500 | |
| IP0157 #08 Y:2022 | 08 | 2022 | Use most efficient type of electric motors | $6,868 | $7,911 |