15
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NC0487 #07 Y:2013 | 07 | 2013 | Reduce the pressure of compressed air to the minimum required | $202 | $50 | |
| NC0487 #06 Y:2013 | 06 | 2013 | Use radiant heater for spot heating | $564 | $1,325 | |
| NC0487 #05 Y:2013 | 05 | 2013 | Recover waste heat from equipment | $736 | $1,200 | |
| NC0487 #04 Y:2013 | 04 | 2013 | Utilize higher efficiency lamps and/or ballasts | $323 | $840 | |
| NC0487 #03 Y:2013 | 03 | 2013 | Eliminate leaks in inert gas and compressed air lines/ valves | $301 | $100 | |
| NC0487 #02 Y:2013 | 02 | 2013 | Utilize higher efficiency lamps and/or ballasts | $143 | $812 | |
| NC0487 #01 Y:2013 | 01 | 2013 | Utilize higher efficiency lamps and/or ballasts | $4,586 | $9,967 | |
| NC0331 #08 Y:2005 | 08 | 2005 | Eliminate old stock and modify inventory control | $30,479 | $21,000 | |
| NC0331 #07 Y:2005 | 07 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $211 | $100 | |
| NC0331 #06 Y:2005 | 06 | 2005 | Recover waste heat from equipment | $1,252 | $3,726 | |
| NC0331 #05 Y:2005 | 05 | 2005 | Burn a less expensive grade of fuel | $11,070 | $25,000 | |
| NC0331 #04 Y:2005 | 04 | 2005 | Utilize higher efficiency lamps and/or ballasts | $919 | $803 | |
| NC0331 #03 Y:2005 | 03 | 2005 | Utilize higher efficiency lamps and/or ballasts | $1,010 | $50 | |
| NC0331 #02 Y:2005 | 02 | 2005 | Reschedule plant operations or reduce load to avoid peaks | $7,341 | $500 | |
| NC0331 #01 Y:2005 | 01 | 2005 | Use / purchase optimum sized compressor | $1,898 | - |